Any installation carried out within the right-of-way of a Hydro-Québec transmission line must be analyzed to ensure compliance with electrical safety standards. That is why Hydro-Québec requires an electrical protection study for municipal, industrial, and residential projects located near high-voltage lines.
At 3E Ing., we conduct these studies rigorously, in accordance with the Guide for Engineers, Technicians, and Project Managers published by Hydro-Québec.