3E Eng. was mandated by the company Fafard et Frères for the preparation of the one-line diagrams of their installation and for the realization of a Arc Flash study. This study enabled Fafard et Frères to determine the risks associated with Arc Flash exposure throughout its electricity distribution network.
To do this, the experts at 3E Eng. conducted a survey of the plant’s electricity grid to produce the one-line diagrams. They then modeled this network on EasyPower and performed the simulations and calculations to determine the short circuit levels in the various power panels. An analysis of the protections was also carried out to determine the times of interruption of the different levels of faults.
The team then determined the Arc Flash intensity levels and the category of protective equipment required for each electrical panel in the facility. 3E Eng. then provided the customer with the various labels to install on these electrical panels. Finally, training on the security measures associated with Flash Arcs was given to the relevant staff of the plant.